shree cement aac block plant

Industrial boilers

Product thermal capacity: 4-35 t/h

Working pressure: 1.0-2.5 MPA

Outlet temperature: 184-350 ℃

Available fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Available industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

  • Product introduction
  • Technical advantages
Introduction

shree cement aac block plant have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.


shree cement aac block plant.This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).

Digitized manufacture
  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of round coil tube adopts CNC coil tube automatic production line. Once-forming and no need for plastic .
Full argon arc welding
  • The tube butt adopts argon arc welding technique and the seams will be done x ray real-time imaging, preventing unqualified seams from entering coil production line .
Easy operation
  • Heater is wholly assembled before delivery, it is easy for installation, debugging and operating.
  • Fully automatic operating, burning, liquid level of high level tank, outlet temperature and flow rate are adjusted automatically and self-protected.
  • The inlet and outlet with end flanges and flanged cover structure facilitate the installation and layout of tubeline in boiler house.
Less fuel consumption
  • Internal side adopts good insulation material, outside uses stainless steel plate, which can mostly reduce heat lost and make working environment better.
  • Multilayers closely spaced tube bundle and steel rod is used to seal and fix, completely eradicating short circuit of flue gas.
  • Before delivery, the residue moisture is removed completely, so the system draining period is reduced to 2 days from 12 days.
Safely operation
  • The inner coil tube has bigger flow rate, so it is more stable under high temperature operation.
  • Conical coil effectively protects the furnace wall at the end of heater and burner on the top.
shree cement aac block plant shree cement aac block plant shree cement aac block plant

G&P WATER & MARITIME SDN. BH

Salinity Study for the Proposed 2x300MW Coal fired Power Plant at Buroi, Balingian, Sarawak 20 Feasibility Study for the Proposed Separation of Waterways Connecting Btg. Paloh and Btg. Belawai, in the Rajang River Delta 21

lexie@zozen.com > Get A Quote >

On Going Projects | PT. KUMPULAN SUMBER EM

Nickel Smelter & Coal-fired Power Plant, Morowali, Central Sulawesi Highway Construction Cisumdawu (Cileunyi – Sumedang – Dawuan), Central Java PLTU Pulau Baai, Bengkulu, Southwest Sumatra. PLTMH Simalungun, North

lexie@zozen.com > Get A Quote >

List of power stations in Malaysia - IPFS is the

Location of power stations in Malaysia Gas, Hydroelectric, Coal, Wind / Solar / Biomass Cities Hydropower Plant State Scheme Coordinates MW Owner/operator Refs Sultan Azlan Shah Bersia Perak Sungai Perak 72 Perak

lexie@zozen.com > Get A Quote >

POWER GENERATION PLANTS IN MALAYSIA -

PALM OIL ENGINEERING BULLETIN NO. 113 45 Datasheet Power station Location Owner Type MW Gas Fired Power Plants Connaught Bridge Klang, Selangor TNB Combined cycle 832 Genting Sanyen Kuala Langat, Selangor

lexie@zozen.com > Get A Quote >

(PDF) Power Generation Sources in Malaysia: Status an

Power Generation Sources in Malaysia: Status and Prospects for Sustainable Development Article (PDF Available) · September 2016 with 17,643 Reads Cite this publication Mohamed Syahril Nazreen Samsudin Md. Mizanur

lexie@zozen.com > Get A Quote >

YTL Corporation Berhad - Operation & Maintenance

Combined cycle gas-fired power generation 100% stake in YTL Power Services Sdn Bhd, the O&M company operating 1,212 MW power stations in Paka & Pasir Gudang, Malaysia. Coal-fired power generation 100% stake in P.T. YTL

lexie@zozen.com > Get A Quote >

List of power stations in Malaysia - Revol

List of power stations in Malaysia topic Kuching Kuala Lumpur Ipoh Manjung Bakun Dam Tuanku Jaafar Hydropower Plant State Scheme Coordinates MW Owner/operator Refs Sultan Azlan Shah Bersia Perak Sungai Perak 72

lexie@zozen.com > Get A Quote >

Cintalam Sdn Bhd, Infrastructure Works, Submarine Pip

Proposed 2 x 700 MW Coal Fired Power Plant at Kuala Lukut, Mukim Jimah, Negeri Sembilan-Subcontract Works for Construction Completion and Maintenance of the Cooling Water Intake Channel. Client / Main Contractor 4

lexie@zozen.com > Get A Quote >

40 tph 67 kg pressure water tube high pressure steam

80 tph Baggase steam boiler – CFBC Boiler Manufacturer Feb 21, 2017 – coal per hour required for 80 tph boiler afbc – CFBC Operation of 80 MW power plant consisting of 8 X 55 TPH coal per 40 tph water tube high pressure steam

lexie@zozen.com > Get A Quote >

Ranhill Bersekutu Sdn. Bhd – Power & Industri

SJSAS – 3 X 700 MW Coal-Fired Power Station Located in the Manjung District of Perak, the power plant is situated on reclaimed land, connected to the mainland by a causeway. RBSB provided civil and structural engineering and

lexie@zozen.com > Get A Quote >

Rebar Mechanical Coupler Splice for Dam,Hydroelectric

2015/07/14 · "FD Grip" The No.1 earthquake-resistant rebar coupler in Japan, the highest seismic country, for over 30 years. TEL:+62-21-6471-2565 index.html

lexie@zozen.com > Get A Quote >