wetback boiler at bhel bhopal

Industrial boilers

Product thermal capacity: 4-35 t/h

Working pressure: 1.0-2.5 MPA

Outlet temperature: 184-350 ℃

Available fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Available industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

  • Product introduction
  • Technical advantages
Introduction

wetback boiler at bhel bhopal have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.


wetback boiler at bhel bhopal.This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).

Digitized manufacture
  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of round coil tube adopts CNC coil tube automatic production line. Once-forming and no need for plastic .
Full argon arc welding
  • The tube butt adopts argon arc welding technique and the seams will be done x ray real-time imaging, preventing unqualified seams from entering coil production line .
Easy operation
  • Heater is wholly assembled before delivery, it is easy for installation, debugging and operating.
  • Fully automatic operating, burning, liquid level of high level tank, outlet temperature and flow rate are adjusted automatically and self-protected.
  • The inlet and outlet with end flanges and flanged cover structure facilitate the installation and layout of tubeline in boiler house.
Less fuel consumption
  • Internal side adopts good insulation material, outside uses stainless steel plate, which can mostly reduce heat lost and make working environment better.
  • Multilayers closely spaced tube bundle and steel rod is used to seal and fix, completely eradicating short circuit of flue gas.
  • Before delivery, the residue moisture is removed completely, so the system draining period is reduced to 2 days from 12 days.
Safely operation
  • The inner coil tube has bigger flow rate, so it is more stable under high temperature operation.
  • Conical coil effectively protects the furnace wall at the end of heater and burner on the top.
wetback boiler at bhel bhopal wetback boiler at bhel bhopal wetback boiler at bhel bhopal

BHEL PSWR - Nagp

Order received for Erection, checking of calibration, Testing, Commissioning and Handing over of Control & Instrumentation works for Boiler and its Auxilliaries, Turbigenerator and its Auxiliaries, Station C&I for 1 x 800 MW GSECL

lexie@zozen.com > Get A Quote >

BHEL Careers Port

BHEL, one of India s leading PSUs, is today the largest engineering enterprise of its kind in India. BHEL caters to the needs of core sectors of the economy like Power, Transmission, Industry, Transportation (including

lexie@zozen.com > Get A Quote >

BHEL - Bharat Heavy Electricals Limit

BHEL, Bhopal BHEL, Bhopal BHEL, Chennai BHEL, Chennai BHEL, CSU and FP Jagdishpur BHEL, CSU and FP Jagdishpur BHEL, EPD BHEL, EPD BHEL, Haridwar BHEL, Haridwar BHEL, HRDI BHEL, HRDI BHEL, Hyderabad

lexie@zozen.com > Get A Quote >

Bhel sends key component for thermal power plant it i

2019/03/10 · Collector vessel is a component in the startup circuit of a supercritical boiler where water will be collected till the steam it generate reaches supercritical stage. The vessel measuring 17 metres in length and weighing 23 tonnes is

lexie@zozen.com > Get A Quote >

boiler manufacturers in kera

Balkrishn Boilers,steam boiler,boiler,water boiler,boiler bbalkrishn boilers,steam boiler,boiler,water boiler,boiler manufacturer,fully wetback three pass packaged boiler,water wall membrane pannel f.b.c. fired boiler,oil and gas fired

lexie@zozen.com > Get A Quote >

BHEL BHOPAL FACTORY , BHOPAL BHEL MACHINE

2016/10/28 · BHEL = BHARAT HEAVY ELECTRICALS LIMITED BHOPAL BHEL ESTABLISHED YEAR = THE BHEL BHOPAL IS ESTABLISHED in 1956 and is continuous progressing till now and awar

lexie@zozen.com > Get A Quote >

BHEL Bhopal Recruitment 2018 Graduate Diplom

BHEL Bhopal Recruitment 2018 Apprentices Notification Diploma Graduate Apprentices 229 jobs apply online application website bhelbpl.co.in Recent Posts RFCL Boiler Proficiency Engineer Recruitment 2019 | Ramagundam

lexie@zozen.com > Get A Quote >

BHEL Recruitment 2019 Latest 87 BHEL jobs vacancie

Job Description : ITI Apprentices Jobs opportunity in BHEL Bhopal BHEL Bhopal recruiting 750 Vacancies for ITI Apprentices Department/ Bhopal Last Date 10 Feb 18 View Posted on : 1 years ago BHEL Jobs for Engineer ), )

lexie@zozen.com > Get A Quote >

BHEL Bhopal, PIPLANI, Bhopal (201

Bharat Heavy Electricals Limited is one of the oldest and largest state-owned engineering and manufacturing enterprise in India. Heavy Electrical Plant , Bhopal is the mother plant of Bharat Heavy Electricals Limited, the largest

lexie@zozen.com > Get A Quote >

BHEL Bags Order For Setting Up 660 MW Supercritica

BHEL's scope of work in the project includes design, engineering, manufacture, supply, erection, testing and commissioning of the Main Plant Turnkey Package, comprising supercritical boiler and turbine generator along with its

lexie@zozen.com > Get A Quote >

660 mw heavy oil power pla

China integrated two-pass wetback fire tube boiler is an ideal choice for all industrial and commercial… More Online Chat Gas or Oil Fired Split Hot Water Boiler After years’ data accumulation from our users, the wet back design

lexie@zozen.com > Get A Quote >