estimated cost of a 3 lakh kl boiler in india

Industrial boilers

Product thermal capacity: 4-35 t/h

Working pressure: 1.0-2.5 MPA

Outlet temperature: 184-350 ℃

Available fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Available industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

  • Product introduction
  • Technical advantages
Introduction

estimated cost of a 3 lakh kl boiler in india have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.


estimated cost of a 3 lakh kl boiler in india.This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).

Digitized manufacture
  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of round coil tube adopts CNC coil tube automatic production line. Once-forming and no need for plastic .
Full argon arc welding
  • The tube butt adopts argon arc welding technique and the seams will be done x ray real-time imaging, preventing unqualified seams from entering coil production line .
Easy operation
  • Heater is wholly assembled before delivery, it is easy for installation, debugging and operating.
  • Fully automatic operating, burning, liquid level of high level tank, outlet temperature and flow rate are adjusted automatically and self-protected.
  • The inlet and outlet with end flanges and flanged cover structure facilitate the installation and layout of tubeline in boiler house.
Less fuel consumption
  • Internal side adopts good insulation material, outside uses stainless steel plate, which can mostly reduce heat lost and make working environment better.
  • Multilayers closely spaced tube bundle and steel rod is used to seal and fix, completely eradicating short circuit of flue gas.
  • Before delivery, the residue moisture is removed completely, so the system draining period is reduced to 2 days from 12 days.
Safely operation
  • The inner coil tube has bigger flow rate, so it is more stable under high temperature operation.
  • Conical coil effectively protects the furnace wall at the end of heater and burner on the top.
estimated cost of a 3 lakh kl boiler in india estimated cost of a 3 lakh kl boiler in india estimated cost of a 3 lakh kl boiler in india

Tamil Nadu Newsprint And Papers Directors Report |

Tamil Nadu Newsprint And Papers Director Information - Get the latest information about Directors of Tamil Nadu Newsprint And Papers on The Economic Times Never miss a great news story! Get instant notifications from Allow

lexie@zozen.com > Get A Quote >

Cost of Living in Chennai. May 2019. Prices in Chenn

My parents age in their late 75 never lived in India before, but have visited 2 times for 2 weeks or 3 weeks stay. They really enjoyed it, and now they want to permanent move there, like migrate as they have overseas citizen of India

lexie@zozen.com > Get A Quote >

Rs 350 crore: That's the production cost for Rajinikanth

Rs 350 crore: That's the production cost for Rajinikanth and Akshay Kumar's Robot 2.0, details inside! Rajinikanth and Akshay Kumar-starrer 2.0 will be made at Shankar’s Robot starring Rajinikanth was made at Rs 150 crore. The

lexie@zozen.com > Get A Quote >

Centre to take a call on BSNL, MTNL reviv

For BSNL, about 55% of its expenditure goes into employee salaries as it has a huge base of 1.76 lakh employees across India. For MTNL, the expenditure on employees is around 99%. A VRS proposal for Rs 6,365 crore for

lexie@zozen.com > Get A Quote >

Oxygen Sensors at Best Price in Ind

Find here online price details of companies selling Oxygen Sensors. Get info of suppliers, manufacturers, exporters, traders of Oxygen Sensors for buying in India. NTK Oxygen Sensors combines expertise with innovation and

lexie@zozen.com > Get A Quote >

Maruti Alto K10 Price (Exciting Offers!), Images, Review

2019/05/24 · The Maruti Alto K10 is priced in the range of Rs.3.39 - 4.25 Lakh*(Ex-Showroom Delhi). Moreover, you may also click on the link given below for the variant wise estimated on road price of the car. You may also check out

lexie@zozen.com > Get A Quote >

DM Water Plant - DM Plant Latest Price, Manufacturer

Find here DM Water Plant, DM Plant manufacturers, suppliers & exporters in India. Get contact details & address of companies manufacturing and supplying DM Water Plant, DM Plant across India. Specifications: - Material

lexie@zozen.com > Get A Quote >

OF - Welcome to Environme

Estimated project cost along with analysis in terms of economic viability of the project 41 9. Analysis of Proposal (Final Recommendations )

lexie@zozen.com > Get A Quote >

Study of Equipment Prices in the Power Sect

Energy Sector Management Assistance Program Study of Equipment Prices in the Power Sector ESMAP Technical Paper 122/09 ESMAP Technical Paper 122/09 Study of Energy Sector Management Assistance Program

lexie@zozen.com > Get A Quote >

BOILERS | Energy-Models.c

Fire tube boilers, typically have a lower initial cost, are more fuel efficient and easier to operate, but they are limited generally to capacities of 25 tons/hr and pressures of 17.5 kg/cm 2. Figure 2.2 Fire Tube Boiler Figure 2.3 Water

lexie@zozen.com > Get A Quote >

EXECUTIVE SUMMARY IN ENGLI

The water requirement of the unit will be satisfied through Bore well. The Industrial water consumption for proposed Resin plant will be KL/Day which will be used for 34 Cooling (make-up), steam boiler, scrubbing & washing purpose.

lexie@zozen.com > Get A Quote >