nagai power plant

Industrial boilers

Product thermal capacity: 4-35 t/h

Working pressure: 1.0-2.5 MPA

Outlet temperature: 184-350 ℃

Available fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Available industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

  • Product introduction
  • Technical advantages
Introduction

nagai power plant have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.


nagai power plant.This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).

Digitized manufacture
  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of round coil tube adopts CNC coil tube automatic production line. Once-forming and no need for plastic .
Full argon arc welding
  • The tube butt adopts argon arc welding technique and the seams will be done x ray real-time imaging, preventing unqualified seams from entering coil production line .
Easy operation
  • Heater is wholly assembled before delivery, it is easy for installation, debugging and operating.
  • Fully automatic operating, burning, liquid level of high level tank, outlet temperature and flow rate are adjusted automatically and self-protected.
  • The inlet and outlet with end flanges and flanged cover structure facilitate the installation and layout of tubeline in boiler house.
Less fuel consumption
  • Internal side adopts good insulation material, outside uses stainless steel plate, which can mostly reduce heat lost and make working environment better.
  • Multilayers closely spaced tube bundle and steel rod is used to seal and fix, completely eradicating short circuit of flue gas.
  • Before delivery, the residue moisture is removed completely, so the system draining period is reduced to 2 days from 12 days.
Safely operation
  • The inner coil tube has bigger flow rate, so it is more stable under high temperature operation.
  • Conical coil effectively protects the furnace wall at the end of heater and burner on the top.
nagai power plant nagai power plant nagai power plant

Haruyasu Nagai's research works | Japan Atomic Energ

Haruyasu Nagai's 61 research works with 1,761 citations and 6,072 reads, including: Model Intercomparison of Atmospheric 137Cs From the Fukushima …

lexie@zozen.com > Get A Quote >

Thermal Power Plant Jobs in Nagapattinam Tn - 13 Therma

Apply to 13 Thermal Power Plant Jobs in Nagapattinam Tn on Naukri.com, India's No.1 Job Portal. Explore Thermal Power Plant job openings in Nagapattinam Tn Now!

lexie@zozen.com > Get A Quote >

Chapter 15 Source Term Estimation of Discharged from th

spheric dispersion around the Fukushima Daiichi Nuclear Power Plant was carried out, revealing the formation process of high dose rate zones in a northwest direction from the plant. With this and further analyses for the early phase of the accident, the release rates and total amounts of 131I and 137Cs discharged into the atmosphere were

lexie@zozen.com > Get A Quote >

Nagapattinam - Nagai Coal Power Plant (Under Constructio

Sun Pharma - Silvassa Pharmaceutical Plant Sun Pharma - Panoli Pharmaceutical Plant Sun Pharma - Ankleshwar Pharmaceutical Plant Sun Pharma - Dewas Pharmaceutical Plant Metal One - Sri City Steel Processing Plant Isuzu - Sri City Car Assembly Plant Velbon Vitrified - Unchimandal Ceramic Plant Nexion - Unchimandal Ceramic Plant

lexie@zozen.com > Get A Quote >

Adhunik Group of Industri

Adhunik Alloys & Power Limited, a part of the Adhunik Group, located at Kandra in Jharkhand, is an integrated steel plant based on Sponge Iron Technology. AAPL has 2 x 350 TPD DRI Plant with an installed capacity of 220,000 M.T.P.A, a Coal Washery of 1,000 TPD, a 30 MW Captive Power Plant, 2 x 30 ton Induction Furnaces and a 2–strand Continuous Caster and Rolling Mill of 147,700 TPA.

lexie@zozen.com > Get A Quote >

Nagai Power Pvt Ltd in Chennai - Grotal.c

Heading: Nagai Power Pvt Ltd, City: Chennai, Results: Nagai Power Pvt Ltd T Nagar, Involvements: Industries Power Plant Infrastructure Companies Biomass Power Plants near me with phone number, reviews and address.

lexie@zozen.com > Get A Quote >

Kvk Energy & Infrastructure Private Limited - Servic

The Nagai Power project of 300 MW is a coal based project being set up by the KVK Energy & Infrastructure Pvt. Ltd. through a special purpose vehicle(SPV) at Nagapattinam,Tamil Nadu.The Project has commenced construction and is expected to commissioned in June 2013.

lexie@zozen.com > Get A Quote >

Nagai Power Private Limited: Private Company Informatio

Nagai Power Private Limited operates a 300 MW coal-based thermal power plant. The company was incorporated in 2002 and is based in Chennai, India. Nagai Power Private Limited operates as a

lexie@zozen.com > Get A Quote >

Preliminary Estimation of Release Amounts of 131I an

8/17/2017 · Preliminary Estimation of Release Amounts of 131 I and 137 Cs Accidentally Discharged from the Fukushima Daiichi Nuclear Power Plant into the Atmosphere. Shirakata, Tokai-mura, Naka-gun, Ibaraki , 319-1195 , Japan , Haruyasu NAGAI Japan Atomic Energy Agency , 2-4 Shirane, Shirakata, Tokai-mura, Naka-gun,

lexie@zozen.com > Get A Quote >

*Gammon:Order to supply 1x150MW steam turbine for Naga

11/23/2011 · *Gammon:Order to supply 1x150MW steam turbine for Nagai power plant. NDTV Business हिन्दी Movies Cricket Lifestyle Health Food Tech HOP Auto

lexie@zozen.com > Get A Quote >

KVK Energy - Current Projec

Nagai Power Pvt. Ltd. Location: Tamil Nadu Fuel: Domestic coal blended with imported coal Capacity: 300MW The Nagai Power project of 300 MW is a coal based project being set up by the KVK Energy & Infrastructure Pvt. Ltd. through a special purpose vehicle (SPV) at Nagapattinam,Tamil Nadu.

lexie@zozen.com > Get A Quote >