alstom power boiler gmbh

Industrial boilers

Product thermal capacity: 4-35 t/h

Working pressure: 1.0-2.5 MPA

Outlet temperature: 184-350 ℃

Available fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Available industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

  • Product introduction
  • Technical advantages
Introduction

alstom power boiler gmbh have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.


alstom power boiler gmbh.This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).

Digitized manufacture
  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of round coil tube adopts CNC coil tube automatic production line. Once-forming and no need for plastic .
Full argon arc welding
  • The tube butt adopts argon arc welding technique and the seams will be done x ray real-time imaging, preventing unqualified seams from entering coil production line .
Easy operation
  • Heater is wholly assembled before delivery, it is easy for installation, debugging and operating.
  • Fully automatic operating, burning, liquid level of high level tank, outlet temperature and flow rate are adjusted automatically and self-protected.
  • The inlet and outlet with end flanges and flanged cover structure facilitate the installation and layout of tubeline in boiler house.
Less fuel consumption
  • Internal side adopts good insulation material, outside uses stainless steel plate, which can mostly reduce heat lost and make working environment better.
  • Multilayers closely spaced tube bundle and steel rod is used to seal and fix, completely eradicating short circuit of flue gas.
  • Before delivery, the residue moisture is removed completely, so the system draining period is reduced to 2 days from 12 days.
Safely operation
  • The inner coil tube has bigger flow rate, so it is more stable under high temperature operation.
  • Conical coil effectively protects the furnace wall at the end of heater and burner on the top.
alstom power boiler gmbh alstom power boiler gmbh alstom power boiler gmbh

alstom power boilers limited – Industrial Boiler Suppli

Alstom Power Boilers Ltd. vs State Bank Of India And … Alstom Transport is wholly owned by the Alstom group. The facts regarding Alstom Power Boilers Ltd. (APBL) : (i) APBL was incorporated as ACC Vickers Babcock. Top 25 Alstom Power Boiler profiles | LinkedIn Here are …

lexie@zozen.com > Get A Quote >

References - Nestler System Datenba

At the following projects our staff has significantly advanced the course of the project and ensured a successful outcome.

lexie@zozen.com > Get A Quote >

Alstom Power Boiler - Powered by Interoperable Softwa

The portfolio of the German company Alstom Power Boil er GmbH includes turnkey power stations that use various types of energy and technology, creating the perfect scenario for using Tekla’s software. Alstom became familiar with Tekla during the Chinese Wai GaoQiao coal power station project.

lexie@zozen.com > Get A Quote >

Contact ~ Alstom Transport Servic

To request access to ALSTOM Signaling product manuals, documentation, RMA, please choose the "Customer Portal Access Request" in the form dropdown below. Please specify the product line you are interested in in the "Message" area.

lexie@zozen.com > Get A Quote >

Alstom Power System GmbH | Clyde Bergema

Your direct link to Clyde Bergemann Power Group. Download. Social Media

lexie@zozen.com > Get A Quote >

General Electric Manufacturing Compa

Alstom Arabia Power Factory Co., Ltd. is a Joint-Venture registered in Kingdom of Saudi Arabia between General Electric Austria GmbH (formerly Alstom Power) and Arabian Bemco Contracting Co. Ltd, each holding 50% of the shares. The Company was formed to supply HRSG's pressure parts modules and its piping in KSA as the core territory and the Middle East as an additional territory.

lexie@zozen.com > Get A Quote >

Alstom Power Boiler Gmbh - Jana Pawła Ii 12, Centru

Alstom Power Boiler Gmbh in Warsaw, reviews by real people. Yelp is a fun and easy way to find, recommend and talk about what’s great and not so great in Warsaw and beyond.

lexie@zozen.com > Get A Quote >

ALSTOM Power Energy Recovery: alstom, alsthom, energ

Special Heat Exchanger Waste Heat Boiler Contact | Affiliates Alstom Power Alstom Power Energy Recovery GmbH Air Preheater Company Waste Heat Boilers BF Gas Bayonet Carbon Black TGF FCC Regen Municipal Sludge Municipal Solid Pet Coke Calciner Bayonet Tube Boiler manufactured for …

lexie@zozen.com > Get A Quote >

Alstom - Wikiped

Power generation. Alstom power activities were collectively called Alstom Power Systems and included the design, manufacturing, services and supply of products and systems for the power generation sector and industrial markets. The group covered most energy sources, including gas, …

lexie@zozen.com > Get A Quote >

Jack wang - Project manager - industrial developmen

Technical Support Manager Alstom Beizhong Power (Beijing) Co., Ltd. April 2005 – June 2010 5 years 3 months. Beijing, China. Since I joined the company from its build up, I experienced the whole story from how to create a team, train the team, build up the process and manage the first piece manufacturing, stabilize the process and continuos improvements.

lexie@zozen.com > Get A Quote >

Ian Jenkins - Structural Designer - Alstom Power Boile

View Ian Jenkins’ profile on LinkedIn, the world's largest professional community. Ian Jenkins Oil & Energy Professional Gloucester, United Kingdom Oil & Energy. Alstom Power Boiler Gmbh. 72 connections. View Ian Jenkins’ full profile. It's free! Your colleagues, classmates, and 500 million other professionals are on LinkedIn. Join

lexie@zozen.com > Get A Quote >