technical perposal for boiler maintenance at power plant

Industrial boilers

Product thermal capacity: 4-35 t/h

Working pressure: 1.0-2.5 MPA

Outlet temperature: 184-350 ℃

Available fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Available industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

  • Product introduction
  • Technical advantages
Introduction

technical perposal for boiler maintenance at power plant have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.


technical perposal for boiler maintenance at power plant.This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).

Digitized manufacture
  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of round coil tube adopts CNC coil tube automatic production line. Once-forming and no need for plastic .
Full argon arc welding
  • The tube butt adopts argon arc welding technique and the seams will be done x ray real-time imaging, preventing unqualified seams from entering coil production line .
Easy operation
  • Heater is wholly assembled before delivery, it is easy for installation, debugging and operating.
  • Fully automatic operating, burning, liquid level of high level tank, outlet temperature and flow rate are adjusted automatically and self-protected.
  • The inlet and outlet with end flanges and flanged cover structure facilitate the installation and layout of tubeline in boiler house.
Less fuel consumption
  • Internal side adopts good insulation material, outside uses stainless steel plate, which can mostly reduce heat lost and make working environment better.
  • Multilayers closely spaced tube bundle and steel rod is used to seal and fix, completely eradicating short circuit of flue gas.
  • Before delivery, the residue moisture is removed completely, so the system draining period is reduced to 2 days from 12 days.
Safely operation
  • The inner coil tube has bigger flow rate, so it is more stable under high temperature operation.
  • Conical coil effectively protects the furnace wall at the end of heater and burner on the top.
technical perposal for boiler maintenance at power plant technical perposal for boiler maintenance at power plant technical perposal for boiler maintenance at power plant

TOP 250+ Thermal Power Plant Interview Questions an

2014/12/24 · 250+ Thermal Power Plant Interview Questions and Answers, Question1: What are the main circuits in the Thermal Power Plant? Question2: Steam power plant works on which cycle? Question3: What is the Thermal efficiency of

lexie@zozen.com > Get A Quote >

Power Plant Engineer Resume Samples | JobHe

Find the best Power Plant Engineer resume samples to help you improve your own resume. Each resume is hand-picked from our large database of real resumes 7 Boiler and Power Plant Engineer/maintenance Superintendent

lexie@zozen.com > Get A Quote >

Power Plant Cycling Costs - National Renewable

This report provides a detailed review of the most up to date data available on power plant cycling costs. Increasing variable renewable generation on the electric grid has resulted in increased cycling of conventional fossil generation.

lexie@zozen.com > Get A Quote >

TENDER DOCUMENT FOR Operation &

TENDER DOCUMENT FOR OPERATION & MAINTENANCE OF POWER PLANTS TENDER DOCUMENT FOR Operation & Maintenance contract of Power Plants CPP 540 MW & 1200 MW TENDER NO: BALCO/COM/SER/O & M

lexie@zozen.com > Get A Quote >

Study on Gas-Fired Combined Cycle Power Plant

Study on Economic Partnership Projects in Developing Countries in FY2015 Study on Gas-Fired Combined Cycle Power Plant Project in Malaysia Final Report February 2016 Prepared for: The Ministry of Economy, Trade and

lexie@zozen.com > Get A Quote >

Checklists for Safe and Reliable Boiler Operation - Powe

A boiler inspection is routinely handled by an independent technical specialist. This inspector will check out areas that affect the boiler’s structural integrity. Qualified plant personnel with working knowledge of the boiler can perform

lexie@zozen.com > Get A Quote >

Lessons Learned from Existing Biomass Power Plan

February 2000 Ł NREL/SR-570-26946 Lessons Learned from Existing Biomass Power Plants G. Wiltsee Appel Consultants, Inc. Valencia, California NREL Technical Monitor: Richard Bain Prepared under Subcontract No. AXE

lexie@zozen.com > Get A Quote >

Power Plant Training for Boiler Feedwater Pump

2016/06/09 · The boiler feedwater pump is a typical combined cycle power plant design. This unit is a 2-pressure, 10-stage, direct motor-driven centrifugal pump. The pump

lexie@zozen.com > Get A Quote >

Thermal Power Plants - Fuji Electric Glob

Applying our plant “know-how” for the stable supply of electricity Air-cooled generator Private-use power producing equipment Non-reheating steam turbine Fuji Electric’s Thermal Power Equipment Since producing our first steam

lexie@zozen.com > Get A Quote >

Requirements Manual for Owners Operators of

MAN-4000-03 (2012-03-12) Page 4 of 15 General Supervision Applies to: i. a power plant that does not exceed 30 m2 of boiler capacity, ii. a steam heating plant that does not exceed 200 m2 of boiler capacity, iii. a fluid heating

lexie@zozen.com > Get A Quote >

MAINTENANCE PRACTICES AND PERFORMANCE O

MAINTENANCE PRACTICES AND PERFORMANCE OF POWER SECTOR IN KENYA SOLOMON KARANJA KARIUKI D61/72770/2009 A RESEARCH PROJECT SUBMITTED IN PARTIAL FULFILLMENT OF THE

lexie@zozen.com > Get A Quote >