project on boiler co generation in hindalco industries limited

Industrial boilers

Product thermal capacity: 4-35 t/h

Working pressure: 1.0-2.5 MPA

Outlet temperature: 184-350 ℃

Available fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Available industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

  • Product introduction
  • Technical advantages
Introduction

project on boiler co generation in hindalco industries limited have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.


project on boiler co generation in hindalco industries limited.This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).

Digitized manufacture
  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of round coil tube adopts CNC coil tube automatic production line. Once-forming and no need for plastic .
Full argon arc welding
  • The tube butt adopts argon arc welding technique and the seams will be done x ray real-time imaging, preventing unqualified seams from entering coil production line .
Easy operation
  • Heater is wholly assembled before delivery, it is easy for installation, debugging and operating.
  • Fully automatic operating, burning, liquid level of high level tank, outlet temperature and flow rate are adjusted automatically and self-protected.
  • The inlet and outlet with end flanges and flanged cover structure facilitate the installation and layout of tubeline in boiler house.
Less fuel consumption
  • Internal side adopts good insulation material, outside uses stainless steel plate, which can mostly reduce heat lost and make working environment better.
  • Multilayers closely spaced tube bundle and steel rod is used to seal and fix, completely eradicating short circuit of flue gas.
  • Before delivery, the residue moisture is removed completely, so the system draining period is reduced to 2 days from 12 days.
Safely operation
  • The inner coil tube has bigger flow rate, so it is more stable under high temperature operation.
  • Conical coil effectively protects the furnace wall at the end of heater and burner on the top.
project on boiler co generation in hindalco industries limited project on boiler co generation in hindalco industries limited project on boiler co generation in hindalco industries limited

SWOT ANALYSIS report of Hindalco Industries Limit

The aluminum business of Hindalco is integrated with its own mining and captive power generation capacities. The company is the largest vertically integrated aluminum company in India. It engages in all aspects of the value chain

lexie@zozen.com > Get A Quote >

A Project Report on Working Capital Management of

SWOT Analysis of Hindalco Industries Limited, Belgaum Works STRENGTS: Integrated Operations from Bauxite Mining, Alumina Refining & Specials. Dominate Player in Domestic Market in Specialty Alumina & Hydrates

lexie@zozen.com > Get A Quote >

Hindalco's refinery, smelter projects on tra

The project includes a 90 MW co-generation power plant and a two million tpa bauxite mining facility. Land for the project has been acquired and 70 per cent of the project cost has been arranged. The mechanical completion of the

lexie@zozen.com > Get A Quote >

Circulating Fluidised Bed Combustion (CFBC)

ISO 9001 REGISTERED DNV Certification B.V.,The Netherlands Circulating Fluidised Bed Combustion (CFBC) Boilers Powerful solutions for steam generation A Company of ThyssenKrupp Industries India ThyssenKrupp Technologies

lexie@zozen.com > Get A Quote >

cogeneration boil

Project Contact Us cogeneration boiler Home / cogeneration boiler Cogen - What Is Cogeneration? What Is Cogeneration. Cogeneration (Combined Heat and Power or CHP) is the simultaneous production of electricity and heat

lexie@zozen.com > Get A Quote >

REPORT ON MATERIAL MANAGEMENT

ACKNOWLEDGEMENT I am very highly indebted to my parents and teachers who have groomed me to stand the challenges of a professional career and permitted to undergo summer training at HINDALCO INDUSTRIES LIMITED

lexie@zozen.com > Get A Quote >

hindalco boiler renuko

project on boiler co-generation in hindalco industries limited GE's Powering Efficiency COE Solutions Help Aluminium Company Following on the heels of its Powering Efficiency Center of Excellence (COE) launch in March, GE

lexie@zozen.com > Get A Quote >

The ‘Words on Numbers’ Annual report, 2009-

4 Sunil Hitech Engineers Limited 45 The number of Sunil Hitech’s operational sites 10,000 The number of Sunil Hitech’s people (approximately) concurrently working across various project locations 11,245 Capacity commissioned by

lexie@zozen.com > Get A Quote >

Electricity Biomass Hot Water Boiler Deal

project on boiler and co generation department in hindalco industries limited Locomotive Gas Water Boiler Price objectives of power plant and boilers Coal Fired Power Plant CFBC Boiler in Russia boiler waste oil water 1 mw

lexie@zozen.com > Get A Quote >

ENERGY PLANT - poscoenc.c

ENERGY PLANT Project Start Completion Location Client Generation Capacity Angamos coal fired power plant Oct. 2007 Aug. 2011 Antofagasta, Chile AES Gener 260MW x 2 Scope: EPC Turn-Key Main facilities - Steam Turbines

lexie@zozen.com > Get A Quote >

SATYENDRA KUMAR - Assistant Manager - Hindalc

SATYENDRA KUMAR liked this View my verified achievement from EY on Acclaim. Earners of this badge have a basic understanding of the robotic process automation Assistant Manager Hindalco Industries Limited May 2015 – Present

lexie@zozen.com > Get A Quote >