hot water heater 110 volt

Industrial boilers

Product thermal capacity: 4-35 t/h

Working pressure: 1.0-2.5 MPA

Outlet temperature: 184-350 ℃

Available fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Available industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

  • Product introduction
  • Technical advantages
Introduction

hot water heater 110 volt have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.


hot water heater 110 volt.This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).

Digitized manufacture
  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of round coil tube adopts CNC coil tube automatic production line. Once-forming and no need for plastic .
Full argon arc welding
  • The tube butt adopts argon arc welding technique and the seams will be done x ray real-time imaging, preventing unqualified seams from entering coil production line .
Easy operation
  • Heater is wholly assembled before delivery, it is easy for installation, debugging and operating.
  • Fully automatic operating, burning, liquid level of high level tank, outlet temperature and flow rate are adjusted automatically and self-protected.
  • The inlet and outlet with end flanges and flanged cover structure facilitate the installation and layout of tubeline in boiler house.
Less fuel consumption
  • Internal side adopts good insulation material, outside uses stainless steel plate, which can mostly reduce heat lost and make working environment better.
  • Multilayers closely spaced tube bundle and steel rod is used to seal and fix, completely eradicating short circuit of flue gas.
  • Before delivery, the residue moisture is removed completely, so the system draining period is reduced to 2 days from 12 days.
Safely operation
  • The inner coil tube has bigger flow rate, so it is more stable under high temperature operation.
  • Conical coil effectively protects the furnace wall at the end of heater and burner on the top.
hot water heater 110 volt hot water heater 110 volt hot water heater 110 volt

VESTA_

107 0100-00542 INTERCONNECT E-DTCU BD 5708 0100-20177 PCB ASSY, WATER/SMOKE DET CENT PVD Applied Materials P-5000 SCRAP INQUIRY 5707 0100-09103 PCB ASSY, A/C INTERCONNECT Applied 5706 0100

lexie@zozen.com > Get A Quote >

Advanced Combustion and Aerothermal Technologie

The process is accomplished by bleeding off the combustion products downstream of the principal smoke exhauster or from the boiler intermediate flue ducts. Recirculating gases are then directed into the furnace or into the 75

lexie@zozen.com > Get A Quote >

11

AUTRONICA 116-BHH-500 OPTICAL SMOKE DET. HEAD W/SV ENV. PROT KTAB 90 CL512 (1.5MW) :TCR.VV21441001 …

lexie@zozen.com > Get A Quote >

ecr.indianrailways.gov.

ch25 ch24 ch23 ch22 ch21 ch20 ch19 ch18 ch17 ch16 ch15 ch14 ch13 ch12 ch11 ch10 ch9 ch8 ch7 ch6 ch5 ch4 ch3 ch2 ch1 index CHAPTER - 1 : EARTHWORK Item No. Description of Item Unit Labour cost Material cost

lexie@zozen.com > Get A Quote >

Electric Panel Tenders – Tenders for Electric Panel

Electric Panel Tenders from India 324 Electric Panel tenders are published by various Tendering Authorities & Private companies. 324 live Tender for Electric Panel are available in Electric Panel Tender section You can further filter

lexie@zozen.com > Get A Quote >

Full text of "ERIC ED070580: Principles of Naval

Search the history of over 357 billion web pages on the Internet.

lexie@zozen.com > Get A Quote >

SECTION 15183 - REFRIGERANT PIPING - ABP

October 15, 2001 CONSTRUCTION STANDARD SPECIFICATION SECTION 15183 REFRIGERANT SYSTEMS PART 1 - GENERAL 1.01

lexie@zozen.com > Get A Quote >

R22 is Going Away Are You Prepared? - The Chemour

Switch now to an alternative refrigerant by The Chemours Company Find out which refrigerant by Chemours is best for your application. R-22 is subject to phaseout, but can easily be replaced with an alternate refrigerant.

lexie@zozen.com > Get A Quote >

Ozone Generation | Products & Suppliers | Engineering3

Find Ozone Generation related suppliers, manufacturers, products and specifications on GlobalSpec - a trusted source of Ozone Generation information. Products & Services All News & Analysis Products & Services Community

lexie@zozen.com > Get A Quote >

dl.acm.o

Temperature control in Variable Air Volume (VAV) air conditioning systems is a complicated process. Either the traditional Proportional Integral Derivative (PID) …

lexie@zozen.com > Get A Quote >

Findchips Pro - Welco

01. About Connecting the dots between internal knowledge and real-time market information. Findchips Pro brings fragmented sources of data together into a single platform and delivers accurate and contextual answers to your most

lexie@zozen.com > Get A Quote >