coke dried quenching heat recovery boiler

Industrial boilers

Product thermal capacity: 4-35 t/h

Working pressure: 1.0-2.5 MPA

Outlet temperature: 184-350 ℃

Available fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Available industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

  • Product introduction
  • Technical advantages
Introduction

coke dried quenching heat recovery boiler have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.


coke dried quenching heat recovery boiler.This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).

Digitized manufacture
  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of round coil tube adopts CNC coil tube automatic production line. Once-forming and no need for plastic .
Full argon arc welding
  • The tube butt adopts argon arc welding technique and the seams will be done x ray real-time imaging, preventing unqualified seams from entering coil production line .
Easy operation
  • Heater is wholly assembled before delivery, it is easy for installation, debugging and operating.
  • Fully automatic operating, burning, liquid level of high level tank, outlet temperature and flow rate are adjusted automatically and self-protected.
  • The inlet and outlet with end flanges and flanged cover structure facilitate the installation and layout of tubeline in boiler house.
Less fuel consumption
  • Internal side adopts good insulation material, outside uses stainless steel plate, which can mostly reduce heat lost and make working environment better.
  • Multilayers closely spaced tube bundle and steel rod is used to seal and fix, completely eradicating short circuit of flue gas.
  • Before delivery, the residue moisture is removed completely, so the system draining period is reduced to 2 days from 12 days.
Safely operation
  • The inner coil tube has bigger flow rate, so it is more stable under high temperature operation.
  • Conical coil effectively protects the furnace wall at the end of heater and burner on the top.
coke dried quenching heat recovery boiler coke dried quenching heat recovery boiler coke dried quenching heat recovery boiler

Model predictive control for improving waste heat

CDQ (coke dry quenching) is a widely used method for recovering waste heat in the steel industry. We have developed a novel, data driven modeling approach and model based control for a CDQ unit to increase steam generation in a

lexie@zozen.com > Get A Quote >

waste heat recovery boiler for coking g

Quality waste heat recovery boiler - 28zr.com Equipped with one of the best coke dry quenching power plant waste heat boiler brands, JSDJ Heavy Industry Co.,Ltd is one of the professional quality waste heat boiler in steel industry

lexie@zozen.com > Get A Quote >

Overview of Waste Heat Recovery for Power and He

Overview of Waste Heat Recovery for Power and Heat Dave Sjoding Northwest Clean Energy Application Center Washington State University Extension Energy Program Waste Heat Recovery for Power and Heat Workshop Chicago, IL

lexie@zozen.com > Get A Quote >

Thermax - Large Boile

Thermax is a pioneer in the field of waste heat recovery boilers for non-recovery type coke ovens/coke dry-quenching (CDQ) plants and is one of the largest suppliers of such boilers in the world. The steam generated from these boilers

lexie@zozen.com > Get A Quote >

Waste Heat Recovery Boiler for Dry Quenching |

2014/06/26 · Waste heat boiler of dry quenching is main energy-saving equipment, which is applied to dry coke quenching auxiliaries. Its function is cooling recycle gas and producing steam. New waste heat boiler developed by our company

lexie@zozen.com > Get A Quote >

Quenching Coke, Quenching Coke Suppliers an

1.MTJ650 PRODUCT DESCRIPTION: This wheels are forged steel wheels, used for ladle, coke tank transportation in steel mill. 2. Package and shipping 3. Tags: Exhaust-heat Boiler | Waste Heat Boiler | Heat Recovery Boiler

lexie@zozen.com > Get A Quote >

Model predictive control for improving waste heat

Model predictive control for improving waste heat recovery in coke dry quenching processes Kai Sun a, Chen-Ting Tseng b, David Shan-Hill Wong b, Shyan-Shu Shieh c, **, Shi-Shang Jang b, *, Jia-Lin Kang b, Wei-Dong Hsieh d a Department of Automation, Qilu University of Technology, Jinan, Shandong 250353, China

lexie@zozen.com > Get A Quote >

China Coke Dry Quenching Power Plant Waste Heat

Equipped with one of the best coke dry quenching power plant waste heat boiler brands, JSDJ Heavy Industry Co.,Ltd is one of the professional quality waste heat boiler in steel industry, coke quenching steam generator, waste heat

lexie@zozen.com > Get A Quote >

Coke Dry Quenching (CDQ) - EC

S-10 Keywords Features Basic Concept or Summary Coke Dry Quenching (CDQ) NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. CDQ is a system to recover the sensible heat of red hot coke by means of inert gas. Then by

lexie@zozen.com > Get A Quote >

China Waste Heat Boiler, Waste Heat Recover

Equipped with one of the best waste heat boiler brands, JSDJ Heavy Industry Co.,Ltd is one of the professional quality waste heat boiler, waste heat recovery manufacturers in China. русский Deutsch Español Việt Nam Italiano

lexie@zozen.com > Get A Quote >

Dry Quenching use industrial boiler waste heat

Coke Dry Quenching iron and steel sector | ClimateTechWiki The iron and steel sector is the second-largest industrial user of a waste heat recovery boiler. China's steel plants use a coke dry quenching system More >>

lexie@zozen.com > Get A Quote >