84 mw power plant

Industrial boilers

Product thermal capacity: 4-35 t/h

Working pressure: 1.0-2.5 MPA

Outlet temperature: 184-350 ℃

Available fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Available industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

  • Product introduction
  • Technical advantages
Introduction

84 mw power plant have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.


84 mw power plant.This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).

Digitized manufacture
  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of round coil tube adopts CNC coil tube automatic production line. Once-forming and no need for plastic .
Full argon arc welding
  • The tube butt adopts argon arc welding technique and the seams will be done x ray real-time imaging, preventing unqualified seams from entering coil production line .
Easy operation
  • Heater is wholly assembled before delivery, it is easy for installation, debugging and operating.
  • Fully automatic operating, burning, liquid level of high level tank, outlet temperature and flow rate are adjusted automatically and self-protected.
  • The inlet and outlet with end flanges and flanged cover structure facilitate the installation and layout of tubeline in boiler house.
Less fuel consumption
  • Internal side adopts good insulation material, outside uses stainless steel plate, which can mostly reduce heat lost and make working environment better.
  • Multilayers closely spaced tube bundle and steel rod is used to seal and fix, completely eradicating short circuit of flue gas.
  • Before delivery, the residue moisture is removed completely, so the system draining period is reduced to 2 days from 12 days.
Safely operation
  • The inner coil tube has bigger flow rate, so it is more stable under high temperature operation.
  • Conical coil effectively protects the furnace wall at the end of heater and burner on the top.
84 mw power plant 84 mw power plant 84 mw power plant

Wärtsilä supplies a 57 MW power plant to Sierra Leo

Wärtsilä has been appointed the EPC contractor for a 57 MW Smart Power Generation plant to be supplied to CECA SL Generation Ltd., a Sierra Leone company co-owned by CEC Africa Investments and TCQ Power. The turn-key

lexie@zozen.com > Get A Quote >

Construction Complete on 84 MW Large-Scale Solar

May 29, 2013 Construction Complete on 84 MW Large-Scale Solar Power Generation Plant in Thailand Sharp Is the EPC *1 Contractor for One of the Largest *2 Solar Power In May 2013, construction was completed on one of the

lexie@zozen.com > Get A Quote >

Power Generation - LUKOIL - PJSC "LUKOI

The Company's power generation segment is represented by a fully vertically integrated chain, from generation to transmission and distribution of heat and power to external consumers (commercial power generation) and for own

lexie@zozen.com > Get A Quote >

Design and Development of 5MW Solar PV Grid

Design and Development of 5MW Solar PV Grid Connected Power Plant Using PVsyst Vasanthkumar1, Dr. S. Kumarappa2, Dr. H. Naganagouda3

lexie@zozen.com > Get A Quote >

Combined Cycle Power Plant - Power & Energy Busines

Client Ashuganj Power Station Company Capacity 1 GT + 1 HRSG + 1ST Capacity : 225 MW GT : 144 MW (SGT5-PAC 2000E, Siemens) ST : 84 MW (Siemens) HRSG : DKME, Korea Power & Energy plant is the high value

lexie@zozen.com > Get A Quote >

キャンパスをした 「

Generating capacity: Approx. 1.84 MW Power Plant 2 Area: Approx. 8,300 m2 Generating capacity: Approx. 0.52 MW Power Plant 1 Power Plant 2 Land owners Address International Christian University 1186-132 Nasu-michiue

lexie@zozen.com > Get A Quote >

How many kilowatts per hour of power can a 1 MW

Short answer: a 1 megawatt (MW) plant generates exactly 1 MW of power. Watt and its multiples are units of power: energy produced (or consumed) over a unit of time. (Indeed, this is a good thing to remember: power is energy

lexie@zozen.com > Get A Quote >

Study of Equipment Prices in the Power Sect

Energy Sector Management Assistance Program Study of Equipment Prices in the Power Sector ESMAP Technical Paper 122/09 ESMAP Technical Paper 122/09 Study of Energy Sector Management Assistance Program

lexie@zozen.com > Get A Quote >

What is the meaning of a power plant's MW productio

Watt is unit of power. KiloWatt-Hour means, 1000 watts of power utilised (or produced) for one hour. Assume, wattage of an electric appliance is 100 watts and it runs for 24 hours a day, the power consumed is 100 watts x 24 hours

lexie@zozen.com > Get A Quote >

Power Barge Co

international power barge corporation provides turnkey engineering, procurement, construction, and maintenance services to developer, owners and operators of power barges or barge mounted power plants The world’s most

lexie@zozen.com > Get A Quote >

Bangladesh Sylhet Combined Cycle Power Plan

Bangladesh Sylhet Combined Cycle Power Plant Construction Project (I) (II) Report Date: September 2002 Field Survey: September 2001 1. Project Profile and Japan’s ODA Loan Site Map: Sylhet District Site

lexie@zozen.com > Get A Quote >