boiler retubing procedure

Industrial boilers

Product thermal capacity: 4-35 t/h

Working pressure: 1.0-2.5 MPA

Outlet temperature: 184-350 ℃

Available fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Available industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

  • Product introduction
  • Technical advantages
Introduction

boiler retubing procedure have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.


boiler retubing procedure.This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).

Digitized manufacture
  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of round coil tube adopts CNC coil tube automatic production line. Once-forming and no need for plastic .
Full argon arc welding
  • The tube butt adopts argon arc welding technique and the seams will be done x ray real-time imaging, preventing unqualified seams from entering coil production line .
Easy operation
  • Heater is wholly assembled before delivery, it is easy for installation, debugging and operating.
  • Fully automatic operating, burning, liquid level of high level tank, outlet temperature and flow rate are adjusted automatically and self-protected.
  • The inlet and outlet with end flanges and flanged cover structure facilitate the installation and layout of tubeline in boiler house.
Less fuel consumption
  • Internal side adopts good insulation material, outside uses stainless steel plate, which can mostly reduce heat lost and make working environment better.
  • Multilayers closely spaced tube bundle and steel rod is used to seal and fix, completely eradicating short circuit of flue gas.
  • Before delivery, the residue moisture is removed completely, so the system draining period is reduced to 2 days from 12 days.
Safely operation
  • The inner coil tube has bigger flow rate, so it is more stable under high temperature operation.
  • Conical coil effectively protects the furnace wall at the end of heater and burner on the top.
boiler retubing procedure boiler retubing procedure boiler retubing procedure

Maintenance-ENG - Alruq

Retubing After washing it may be necessary to retube the tube bundle partially or completely. The operations shown below give a summary of the use of our tools, equipments and machines used together in the Cutting procedure The Kattex is both simple to use and innovative.

lexie@zozen.com > Get A Quote >

Boiler Tube Failures - eecpowerindia.c

Cost of boiler tube failures 9/4/2013 Steag O&M Company 7 The cost of boiler tube failures is comprised of three main components; the cost of the repair, the cost of start up oil to return unit to service, and the cost of lost production. A rule of thumb for repair costs of 200000 per day out of service+ cost of material

lexie@zozen.com > Get A Quote >

Correct Tubes Expansion | KRAIS Tube & Pipe Too

The following suggestions are offered to aid in the setting up process for rolling tubes into a heat exchanger or boiler. A good start assures good end results: 1. Pick 3 to 5 tubes in the unit to be rolled and complete the formula on the page A-1. It is important that the Measurements used in the set- up are actual, never use averaged dimensions.

lexie@zozen.com > Get A Quote >

boiler retubing procedure – Industrial Autoclave & Boiler Sa

Keyword: Industrial Autoclave & Boiler Sale, boiler retubing procedure boiler retubing procedure. Posted on 2017-02-24 by Jenny Wu. How to Destroy a Boiler — Part 2. Summary: The following article is a part of National Board Classic Series and it was published in the National Board BULLETIN.

lexie@zozen.com > Get A Quote >

Boiler retubing & boiler tube replaceme

Retubing & tube replacement for boilers of all sizes. IB&M specializes in the retubing of firetube boilers, watertube boilers, superheaters, pre-heaters, heat exchangers and other pressure vessels. Boiler tubes must be able to endure extremely high temperatures, pressures, and potentially wide fluctuations in demand depending on the application.

lexie@zozen.com > Get A Quote >

AODownload - ID

© 2010 IDEC Corporation All rights reserved. Use of, and copying from, this site is subject to our terms conditions.

lexie@zozen.com > Get A Quote >

Installation, Inspection, Maintenance, and Repair Requiremen

Chapter 14 | Installation, Inspection, Maintenance, and Repair Requirements . 9 December 2015 SLAC-I-730-0A21S-053-R004 4 of 8 When recommended by the pressure system inspector A pressure system that includes an American Society of Mechanical Engineers (ASME) code designed vessel must be equipped with ASME-rated pressure relief devices.

lexie@zozen.com > Get A Quote >

McKENZIE & RIDLEY (KAWERAU) LTD BOILER ENGINEERIN

Boiler Surveys, Commissioning & Maintenance; Boiler upgrades and philosophy; Boiler and ancilliary equipment retubing; Boiler tube Swaging, expanding & extraction; Tube/Pipe bending with formers for 1” through 4.5” (max. 6”) Boiler Operators available for holiday …

lexie@zozen.com > Get A Quote >

Method of statment of re-tubing process.pdf | Welding (64

Method of statment of re-tubing process.pdf - Download as PDF File (.pdf), Text File (.txt) or read online. Scribd is the world's largest social reading and publishing site. Search Search. Close suggestions. TITLE Method Statement for Boiler Retubing. Revision 00. Method Statement For Boiler Retubing. Name Prepared By. Signature.

lexie@zozen.com > Get A Quote >

Chapter 15 - Chemical Cleaning Of Steam Generator Syste

Thus, as boiler water is heated, the solubility of scale-forming salts is exceeded and crystallization takes place on the boiler heating surfaces. Removal of deposits has advantages other than minimization of failures. Cleaning reveals the true boiler metal condition, allowing more complete inspection.

lexie@zozen.com > Get A Quote >

RISK ASSESSMENT & METHOD STATEMENT Example

a. Work location is the stables boiler room b. Access to the work locations to be via Another Limited office and then through courtyard into stables plant room c. Materials to be kept at site for duration of works will be safely stored as directed by Another Limited personnel, ensuring no access / …